Maintenance and repair items that we will be working on during this closure include:
- Completing ADA requirements in the public locker rooms including installing slimmer hand dryers and moving the benches to allow for proper clearance for those in wheel chairs
- Replacing all the lights in the public locker rooms with LED lights and replace all the rusted and damaged light covers
- Repairing the concrete bases for the lockers at each pool
- Replacing several metal doors that are rusting and deteriorating
- Repairing missing/damaged tiles surrounding each pool
- Repairing the Sundeck floor coating
- Completing tile repair in staff offices
- Completing annual pool boiler/heater maintenance
- Completing preventative maintenance on all pool pumps and equipment