The Santa Monica Swim Center will be closed beginning Tuesday, December 20, 2016 and will re-open Monday, January 23, 2017

Maintenance and repair items that we will be working on during this closure include:

  • Completing ADA requirements in the public locker rooms including installing slimmer hand dryers and moving the benches to allow for proper clearance for those in wheel chairs
  • Replacing all the lights in the public locker rooms with LED lights and replace all the rusted and damaged light covers
  • Repairing the concrete bases for the lockers at each pool
  • Replacing several metal doors that are rusting and deteriorating
  • Repairing missing/damaged tiles surrounding each pool
  • Repairing the Sundeck floor coating
  • Completing tile repair in staff offices
  • Completing annual pool boiler/heater maintenance
  • Completing preventative maintenance on all pool pumps and equipment